Boeing 737-800 Technical Manual Apr 2026

The technical manual had a chart for that too—not the performance tables from the FCOM, but the actual Boeing certified data for damaged flap deployment. Ellis read the line aloud: "Flaps 15, brake cooling schedule: 2200 feet at MLW. Dry runway. Add 20% for lightning strike uncertainty."

The investigator nodded and made a note: Recommendation: 737-800 pilots familiarize with Ch. 7, Sec. 3.2. boeing 737-800 technical manual

The FO blinked. "How do you know that?"

Go to Top